Please quote your most competitive rates for the supply of the materials listed in the table below to M/s. Dungsam Cement Corporation Limited (DCCL), in accordance with the following terms and conditions:
Sl.# | Material Code | Material Discription | Qty | UoM | Rate | Amount |
1 | 20005549 | Swing type NRV 350mm. (Pump house) NRV swing flap type 350mm PN16 complete set (photo sample wil be provided) Kohli make) |
2 | NOS | ||
2 | 30007112 | H.T spring washer M10 | 40 | NOS | ||
3 | 30006752 | PP water softener strainer 10mm X 120mm (PP water softener stainer 20mm X 120mm size. Sample photo will be provided) |
240 | NOS | ||
4 | 30007108 | Oil seal 68 x 50 x 8 (SKF make) | 6 | NOS | ||
5 | 30007106 | Tank nipple 1/2 inch (Kholi make) | 5 | NOS | ||
6 | 30001409 | Tank Nipple 3/4″ (Kholi make) | 5 | NOS | ||
7 | 30001407 | Tank Nipple 1″ (Kholi make) | 5 | NOS | ||
8 | 30001410 | Tank Nipple 1 1/4″ (Kholi make) | 5 | NOS | ||
9 | 30005496 | Tank nipple 2″ (Kholi make) | 5 | NOS | ||
10 | 30004442 | Allen Key 2mm-12mm (Taparia make) | 1 | Set |
Terms and Conditions
- Submission of Quotations
Quotations must be submitted as password-protected documents to procurement@dccl.bt no later than 11:00 AM BST on 11th August. Submissions received after the deadline will be deemed invalid and will not be considered for evaluation.
-
Password ProtocolPlease do not share passwords at the time of submission. Passwords will be requested by DCCL at the time of bid opening.
-
Specification Compliance
All bidders are required to quote strictly in line with the specifications provided. Any deviations will render the quotation invalid. -
Clarifications on Specifications
In case of any ambiguity or lack of clarity in the specifications, bidders are advised not to quote until clarification is obtained from the Procurement Section. -
No Clarification Post Order
Please note that no clarifications will be entertained once the Purchase Order (PO) has been issued. -
Payment Terms
Payment will be made only after delivery of the materials. No advance payment shall be made under any circumstances. - Delivery Terms
- The final delivery location is DCCL Store.
- The expected delivery period is within 1 weeks from the date of issuance of the Purchase Order.
- All materials must meet the required specifications. Non-conforming items will be rejected and must be replaced at the supplier’s cost within the original delivery timeline.
-
Failure to replace rejected items within the stipulated time will result in forfeiture of performance security.
- Pricing and Taxes
- Prices must be quoted inclusive of all Indian taxes and duties.
- For Bhutanese bidders, the Bhutan Sales Tax (BST) must be included in the quoted prices.
- For international bidders, BST shall be in DCCL’s scope.
-
During evaluation, the BST component shall be appropriately calculated and considered.
-
Bank Charges
Bank charges incurred during payment processing post-delivery shall be borne by DCCL. -
Liquidated Damages (LD)
Any delay in delivery will attract Liquidated Damages at 0.3% per day, subject to a maximum of 10% of the delayed item(s)’ value. - Replacement of Rejected Items
- Suppliers must replace or lift rejected items within 10 days from the date of receiving a rejection notice from DCCL.
- Failure to comply will incur a penalty of 0.3% per day, up to 30 days.
-
If rejected items are not removed or replaced within 30 days, they shall be confiscated by DCCL, the order shall stand cancelled, and performance security will be forfeited.
-
Warranty Clause
The warranty period is one year or 18 months from delivery/usage, unless specified otherwise. Manufacturer warranties will apply where provided. -
Basis for Order PlacementThe order will be placed base on the lowest evaluated bid or the item-wise lowest rate depending on the nature of the materials and considering the mutual benefit of both the company and the vendor with shortest delivery period.
- Right to Accept or Reject
DCCL reserves the right to accept or reject any or all quotations without assigning any reason.