SEEKING QUOTATION
Dungsam Cement Corporation Limited (DCCL), Bhutan, invites quotations for the supply of the following materials. Interested bidders are requested to submit their most competitive quotations in accordance with the specifications and the terms and conditions stipulated below.
| Sl.# | Material Code | Material Description | Qty | UoM | Rate | Amount |
| 1 | 20006778 | Resilient coupling 104-Z (Make:Fenner) | 10.00 | NOS | ||
| 2 | 20008799 | Twin Lobe Blower. M450, SI:FR10101525 (Model no:M450 Si:FR 10101525, Cap: 30Nm3/hr P:0.5bar, RPM:980 with motor and V belt A 42. Make:EVEREST/AIRSON | 2.00 | NOS | ||
| 3 | 30004562 | Ceramic Tiles. 2mm thickX500X500mm (The supplier should supply its recommended bonding system for fixing the ceramic tiles to the substrate base material(steel). | 20.00 | NOS | ||
| 4 | 20009025 | Air Cylinder for slide gate. A280803200.(Model No:A280803200, Maximum pressure:10 Bar.Make:JANATICS | 3.00 | NOS | ||
| 5 | 30006150 | TMT Bar 16mm (TMT bar steel rod 16 mm) | 2.00 | TON | ||
| 6 | 80000875 | E160-5.5 (ELGI Air end) (E160-5.5# (ELGI Air end) (serial no: BKJL100005, motor 160kw, capacity: 30.3 M^3/min, rated pr: 4.59kg/cm^2. Make:ElGI) | 1.00 | NOS | ||
| 7 | 20008256 | CM water spray nozzle 490.704.1Y.CC.00.0 (Brand: Lechler Part No: CM water spray nozzle 490.724.1Y.CC) |
25.00 | NOS |
Price Quotation Requirements
The quotation shall clearly indicate:
- Cost of materials; and
- Insurance and Freight (CIF basis to DCCL Store).
Failure to provide the required price breakup shall render the quotation non-responsive and liable for rejection.
Terms and Conditions
- Submission of Quotations
Quotations shall be submitted as password-protected documents to procurement@dccl.bt on or before 3:00 PM (BST) on 17th July 2026. Quotations received after the stipulated deadline shall be treated as late submissions and shall not be considered for evaluation.
The opening of quotations shall be conducted on the same day at 3:30 PM (BST).
- Password for Opening of Quotations
Bidders shall not share the password at the time of submission. DCCL shall request the password only during the bid opening process.
- Validity of Quotation
The quotation shall remain valid for a minimum period of 60 days from the date of opening of the quotations.
- Compliance with Specifications
The materials offered shall strictly conform to the specifications provided by DCCL.
- Clarification of Specifications
In case of any ambiguity regarding the specifications, bidders shall obtain clarification from the Procurement before submitting their quotations. No request for clarification or modification shall be entertained after the issuance of the Purchase Order.
- Taxes and Duties
The quoted prices shall be inclusive of all applicable taxes and duties in India. However, any taxes, duties, levies, GST, customs duties, and bank charges payable in Bhutan shall be borne by DCCL.
- Warranty
Where applicable, the supplier shall clearly specify the warranty period, warranty coverage, and after-sales support applicable to the supplied materials.
- Performance Security
The successful bidder shall furnish a Performance Security equivalent to ten percent (10%) of the total Purchase Order value within five (5) days from the date of issuance of the Letter of Acceptance (LoA).
The Performance Security shall be furnished in either of the following forms:
- An unconditional Bank Guarantee issued by a financial institution in Bhutan or
- A cash deposit remitted to any of DCCL’s designated bank accounts maintained with:
- Bank of Bhutan Limited (Bhutan);
- State Bank of India (India); or
- HDFC Bank (India).
The Performance Security shall remain valid until the successful completion of all contractual obligations, including the warranty period, wherever applicable.
Failure to furnish the required Performance Security within the stipulated period shall result in withdrawal of the Letter of Acceptance and cancellation of the award. DCCL shall be under no obligation to place the Purchase Order or incur any liability whatsoever.
In the event the successful bidder fails to supply, DCCL shall forfeit the Performance Security.
- Delivery Requirements
- Delivery shall be made to DCCL Store.
- The delivery period shall be within 45 days from the date of issuance of the Purchase Order.
- The supplier shall ensure that all materials are adequately packed to prevent damage during transportation and handling.
- Inspection and Acceptance
All materials shall be inspected upon receipt at DCCL. Materials found to be defective, damaged during transit, or not conforming to the required specifications shall be rejected.
- Replacement of Rejected Materials
- Rejected materials shall be replaced by the supplier at no additional cost to DCCL.
- The supplier shall lift the rejected materials within 10 days from the date of receipt of DCCL’s rejection notice.
- Replacement materials shall be supplied within the original delivery period stipulated in the Purchase Order.
- Failure to replace or remove the rejected materials within the stipulated period shall constitute a breach of the Purchase Order and shall entitle DCCL to forfeit the Performance Security, either in whole or in part.
- Liquidated Damages
Delay in delivery beyond the stipulated delivery period shall attract Liquidated Damages (LD) at the rate of 0.3% per day, subject to a maximum of 10%.
- Payment Terms
No advance payment shall be made. Payment shall be processed only after successful delivery, inspection, and acceptance of the materials by DCCL.
- Basis of Award
The Purchase Order shall be placed on an item-wise Lowest Evaluated Responsive Bidder (L1) basis.
- Right to Seek Clarification
DCCL reserves the right to seek any clarification, supporting documents, technical literature, catalogues, test certificates, samples, or any other information considered necessary during the evaluation process.
- Cancellation of Purchase Order
DCCL reserves the right to cancel the Purchase Order, either in whole or in part, if the supplier:
- Fails to furnish the required Performance Security within the stipulated period;
- Fails to commence or complete the supply within the delivery period specified in the Purchase Order;
- Repeatedly supplies materials that do not conform to the required specifications; or
- Fails to comply with any other terms and conditions of the Purchase Order.
In such cases, DCCL may forfeit the Performance Security, impose Liquidated Damages (where applicable), recover any losses incurred due to the supplier’s default, and take any other action considered necessary under the terms of the Purchase Order.
- Right to Accept or Reject
DCCL reserves the right to accept or reject any or all quotations, either wholly or partially, without assigning any reason and without incurring any liability whatsoever.
Should you require any clarification regarding this enquiry, please feel free to contact +975-17927929/77927929
