Please quote your most competitive rates for the supply of the materials listed in the table below to M/s. Dungsam Cement Corporation Limited (DCCL), in accordance with the following terms and conditions:
|
Sl.#
|
Material Code
|
Material Description
|
Qty
|
UoM
|
Rate
|
Amount
|
|
1
|
30006908
|
Plywood 6mm
|
50.00
|
NOS
|
||
|
2
|
30002956
|
Ply wood 10mm (water proof)
|
50.00
|
NOS
|
||
|
3
|
30002955
|
Ply wood 8mm (water proof)
|
50.00
|
NOS
|
||
|
4
|
30004108
|
Kiln Refractory Shim plate (180x100x2)
|
400.00
|
NOS
|
||
|
5
|
30003859
|
Kiln Refractory Shim plate (180x200x2)
|
700.00
|
NOS
|
||
|
6
|
90000292
|
Polyester webbing Slings/Lifting belt 3t (Duplex webbing sling with 5m length)
|
5.00
|
NOS
|
||
|
7
|
90000293
|
Polyester webbing Slings/Lifting belt 5t (Duplex webbing sling with 5m length)
|
5.00
|
NOS
|
||
|
8
|
30005775
|
NYLON ROPE 16 MM
|
200
|
M
|
||
|
9
|
30007194
|
Sodium Silicate.Specific Gravity:1.2-1.5
|
800
|
KG
|
||
|
10
|
90000580
|
Chisel for demolition hammer (Chisel for HILTI demolition hammer(TE-SX SM 36,#2341237)
|
20
|
NOS
|
Terms and Conditions
- Submission of Quotations
Quotations must be submitted as password-protected documents to procurement@dccl.bt no later than 11:AM BST on 27th March. Submissions received after the deadline will be deemed invalid and will not be considered for evaluation.
-
Password ProtocolPlease do not share passwords at the time of submission. Passwords will be requested by DCCL at the time of bid opening.
-
Specification Compliance
All bidders are required to quote strictly in line with the specifications provided. Any deviations will render the quotation invalid. -
Clarifications on Specifications
In case of any ambiguity or lack of clarity in the specifications, bidders are advised not to quote until clarification is obtained from the Procurement Section. -
No Clarification Post Order
Please note that no clarifications will be entertained once the Purchase Order (PO) has been issued. -
Payment Terms
Payment will be made only after delivery of the materials. No advance payment shall be made under any circumstances. - Delivery Terms
- The final delivery point in CIF.
- The expected delivery period is within 40 days from the date of issuance of the Purchase Order.
- All materials must meet the required specifications. Non-conforming items will be rejected and must be replaced at the supplier’s cost within the original delivery timeline.
-
Failure to replace rejected items within the stipulated time will result in forfeiture of performance security.
- Pricing and Taxes
- Prices must be quoted inclusive of all Indian taxes and duties.
-
5% GST shall be in DCCL’s scope.
-
Bank Charges
Bank charges incurred during payment processing post-delivery shall be borne by DCCL. -
Liquidated Damages (LD)
Any delay in delivery will attract Liquidated Damages at 0.3% per day, subject to a maximum of 10% of the delayed item(s)’ value. - Replacement of Rejected Items
-
Suppliers must replace or lift rejected items within 30 days from the date of receiving a rejection notice from DCCL.
- Failure to comply will incur a penalty of 0.3% per day, up to 30 days.
-
If rejected items are not removed or replaced within 30 days, they shall be confiscated by DCCL, the order shall stand cancelled, and performance security will be forfeited.
-
-
Warranty Clause
The warranty period is one year or 18 months from delivery/usage, unless specified otherwise. Manufacturer warranties will apply where provided. -
Basis for Order PlacementThe order will be placed base on the lowest evaluated bid or the item-wise lowest rate depending on the nature of the materials and considering the mutual benefit of both the company and the vendor with shortest delivery period.
- Right to Accept or Reject
DCCL reserves the right to accept or reject any or all quotations without assigning any reason.
